morpholine_methylmorpholine_morpholine information network Knowledge if 100 cubic meters of concrete plus retarder requires a retarding time of 6 hours, how much retarder should be used?

if 100 cubic meters of concrete plus retarder requires a retarding time of 6 hours, how much retarder should be used?

if 100 cubic meters of concrete plus retarder requires a retarding time of 6 hours, how much retarder should be used?

the dosage of retarder should be determined based on experiments.

for example: calculated based on four ten thousandths of the cementitious material, assuming 400*0.0004=0.16kg/m3

then 100 cubic meters of concrete requires 0.16*100=16kg

p>

four ten thousandths?

what kind of cement, what kind of retarder, what kind of mix ratio

can you draw conclusions without even knowing it?

i do commercial mixing. i put at least 6 kilograms of c30 concrete retarder per square meter. as if the active ingredient is only 1 kilogram, then 100 square meters of concrete also needs 100 kilograms of active ingredients


</p

This article is from the internet and does not represent Morpholine position. Please indicate the source when reprinting.https://www.morpholine.top/archives/45619

author:

Previous article
Next article
Contact Us

Contact us

+86 - 152 2121 6908

Online consultation: QQ交谈

E-mail: info@newtopchem.com

Working hours: Monday to Friday, 9:00-17:30, closed on holidays
Follow wechat
Scan wechat and follow us

Scan wechat and follow us

Follow Weibo
Back to top
Home
Products
Phone
Search