the dosage of retarder should be determined based on experiments.
for example: calculated based on four ten thousandths of the cementitious material, assuming 400*0.0004=0.16kg/m3
then 100 cubic meters of concrete requires 0.16*100=16kg
p>four ten thousandths?
what kind of cement, what kind of retarder, what kind of mix ratio
can you draw conclusions without even knowing it?
i do commercial mixing. i put at least 6 kilograms of c30 concrete retarder per square meter. as if the active ingredient is only 1 kilogram, then 100 square meters of concrete also needs 100 kilograms of active ingredients
</p